Xingye Machinery

Armenian Client Confirms JS1000 Mixer Performance at Factory

Armenian Client Confirms JS1000 Mixer Performance at Factory
January 21, 2026

Armenian Client Confirms JS1000 Mixer Performance at Factory

On November 4th, 2024, Xingye Machinery welcomed Mr. Sahak from Armenia for a comprehensive technical validation of the JS1000 twin-shaft concrete mixer. As a key component of the HZS60 batching plant, the JS1000 is a critical investment for regional infrastructure; this visit allowed for a deep dive into the engineering standards that define Xingye’s export-grade equipment.

Solving the Logistics Puzzle: 40ft Container Compatibility

One of Mr. Sahak’s primary concerns was international logistics. Shipping heavy machinery to Armenia requires precise dimensional engineering to minimize freight costs. Our team demonstrated how the JS1000 and the integrated 60m³/h all-in-one plant components are designed for optimal 40-foot container loading without compromising structural integrity.

Technical Parameter Specification Verified
Mixer Model JS1000 Twin-Shaft Forced Mixer
Mixing Silo Steel Thickness 4mm Reinforced Steel
Blade Service Life ~80,000 m³ before replacement
Batcher Capacity (PLD1200) 3 m³ per bin
Control System Fully Automated with Overcurrent Protection

Engineering for Durability: Steel and Maintenance

During the workshop walkthrough, we addressed the "wear-and-tear" pain points that often plague project managers in high-output environments:

  • Structural Integrity: We confirmed the 4mm thickness of the mixing silo, ensuring the unit can withstand the abrasive nature of various aggregate types over long-term cycles.
  • Wear Part Lifecycle: Our engineers recommended a replacement cycle of 80,000 cubic meters for the mixing blades, providing Mr. Sahak with a clear ROI and maintenance roadmap.
  • Water Management: The system features a dual-pump configuration for intake and drainage, ensuring precise water-to-cement ratios—a vital factor for high-strength concrete.

Real-World Validation: The 2-Year Performance Check

To move beyond factory specs, Mr. Sahak visited a local operational site featuring a Xingye mixing plant that has been in continuous service for two years. Seeing the equipment perform under real-world conditions—with minimal idle time and consistent output—provided the ultimate proof of reliability for the Armenian market.

Technical Support and After-Sales Commitment

For international clients, parts availability is a major risk factor. Xingye Machinery reinforced our commitment to the Armenian market by outlining our one-year comprehensive warranty. We provide a stock of essential wear parts (conveyor idlers, belt joints, and sensors) and offer local replacement support to ensure zero project downtime.

Mr. Sahak’s visit concludes another successful step in Xingye Machinery’s expansion into Eastern Europe and the Caucasus, proving that technical transparency and robust engineering remain our best selling points.

Interested in the logistics of shipping a 60m³/h plant to your site? Contact our engineering team for a customized loading plan and technical quote.

Tags:
Share:

Newsletter
Subscription

Get In Touch

We're here to help with your project

Contact Us